Beijing TianLiCheng Integrated Housing CO.LTD
Products
Contact Us
  • Contact Person : Mr. Demin Cai
  • Company Name : Beijing TianLiCheng Integrated Housing CO.LTD
  • Tel : 86-010-83488114
  • Fax : 86-010-83488114
  • Address : beijing,beijing,Num88, Yifa Industrial Zone, Langfa Town, Daxing District, Beijing, China
  • Country/Region : China
  • Zip : 102600

Heavy-gauge Steel Structure-H-1-001

Heavy-gauge Steel Structure-H-1-001
Product Detailed
Related Categories:Agricultural Product Stock
Tianli Cheng Co.Ltd is one of the best China heavy-gauge steel structure-h-1-001 manufacturers and suppliers,Website:http://www.steel-structure-villas.com, with productive heavy-gauge steel structure-h-1-001 factory and company, welcome to buy our cheap heavy-gauge steel structure-h-1-001 and wholesale low price products from us.our steel structure workshop is a new type of light steel structure building system formed from a main steel framework comprised of H-beam steel components, the roof and walls utilizing a varity of panel and other components such as window, doors, and cranes. the light steel structure is widely used in the construction of buildings such as warehouse ,workshops, and large factories.Product introduction:Snow loadUp to 1.5KN/㎡Wind loadUp to 2.1KN/㎡Seismic resistanceUp to 9 degreeRoof dead load0.5KN/㎡Roof live load0.5KN/㎡Why light steel is better:FactorTraditional reinforced concrete buildingLight gauge steel buildingSpeed ofconstructionAs reinforced concrete structure, most construction are on-site, also it takes  couple of days for waiting concrete taking  shapes.As modular house,  most parts are prefabricated within factory,   Thus, on-site assembling and construction,  reduced 20% to 40%  time in construction period.Site management costsAs time goes by, the on-site management cost will increase a lot, thus lead to higher overall construction cost.Site management costs can be reduced   by 20% to 30% which can lead to a 3 to 4% saving in terms of overall building cost Site management costs are reduced because of the shorter construction periodLess pollution for environmentThe powder of concrete is kind of pollution  to the air, and the construction process ;  always create a lot of building trash.Less or no pollution to air,also less or no construction trash at all. Shorter construction period will reduce the inconvenience effect to residence people nearby.Multi-function buildingsConcrete building, the structure and  material nature decides that,  in extreme environment area, and some situations, it is not possible to    construct in reinforced concrete.The light weight nature of the steel structure decides that,it can have more function choices like: long span steel construction at the podium level; ; extreme environment building which requires wind load/snow load/seismic resistant/ ;higher stories building,etc.Drawings&Quation:1.Customized design to welcome.2.As long as you like, we can design and provide drawings for you.3.In order to give yo an exactly quotation and drawings,pls tell us the ;Length,width,eave height   and local weather. we'll quote for you asap.our company, can perfectly combine the traditional steel structure building with light steel building, This combination can used as multi-story hotel, department, office building etc, This kind of building has many advantages, such as large span, Low demand of base structure, seismic and wind resistance, fast to build and easy to maintain and so on. It can be built on many special places such as mountain ,beaches and land with bad condition.We can also prefabricated the wall system and roof system for our clients so that it will shorten the construction period. The steel structure can packed in one package, and it is easy to upload, download and stack in the site.FAQ1.You are manufacture factory or trading company?A: We are manufacture factory. And you are welcomed to visit us for inspection..2.Is your price competitive with other companies?A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.3.Do you offer service for installation?A: We will give detailed installation drawings and direction info for free. And we could send engineers as installation director even a team.4.Do you accept container loading inspection?A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.


Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.